Scaffolding in Witney

Witney is twenty minutes west of our yard at Enslow, out along the A4095 through Long Hanborough. It is where Oxfordshire starts turning into the Cotswolds, and the scaffolding changes with it — stone, stone slate and a great many listed buildings.

Call 01869 254017 Request a site visit

Stone slate roofs are not tiled roofs

West of Witney the roofs go over to Cotswold stone slate, and they behave nothing like concrete tile. The slates are heavy, they are graded by size from eaves to ridge, and they are almost always salvaged and relaid rather than replaced. That means a long, slow strip with the slates sorted and stacked as they come off — so the scaffold needs proper loading bays and boarded storage, not just a working lift, and it stands for months rather than weeks. If a quote treats a stone slate re-roof like a tile job, the numbers are wrong.

Church Green & Corn Street

Georgian frontages, a lot of them listed, straight onto the pavement. Highway licence, conservation consent, and fixings that have to go into joints rather than stone. Slow to set up, but it is the work we are known for.

The mill buildings

Witney made blankets for three hundred years and the mill buildings are still here, most of them converted. Tall, solid, awkward to reach, and usually occupied — so the access has to work around people living or working inside.

Madley Park, Deer Park & Cogges

Modern estates on the edges of the town. Extensions, loft conversions, solar and render repairs. Standard work, tight plots, and ground that is often soft at the back.

Business parks & Brize Norton

The industrial estates off the Range Road, plus commercial work out towards Carterton and Brize Norton, where the housing stock and the programmes are a different shape again.

Who you need a licence from

Highway licences come from Oxfordshire County Council. Planning, listed building consent and conservation area matters go through West Oxfordshire District Council. On a listed frontage in the town centre you may well need both, and listed building consent is the one that takes time — start it well before you want us on site.

What we put up here

  • Domestic — extensions, loft conversions, re-roofs, chimneys, repointing and solar.
  • Stone slate re-roofs — long-duration access with loading bays and boarded storage.
  • Listed and conservation work — access designed around what the fabric will take.
  • Temporary roofs — weather protection spanning up to 40 metres. On a stone slate strip that runs through winter this is not optional.

How we work

Free site visit and a written quotation that states the hire period honestly. CISRS-qualified scaffolders working to TG20 and SG4. RAMS and a job-specific toolbox talk before work starts. Statutory inspections at least every seven days. Advanced CHAS accredited, and Oxfordshire Prestige Awards Scaffold Company of the Year four years running.

We cover the rest of Oxfordshire, including Oxford and Bicester.

What putting a scaffold on the highway costs in Witney

If any part of the scaffold stands on the footway, the verge or the carriageway, it needs permission from Oxfordshire County Council before it goes up. Most people have no idea what that costs until it appears on a quotation, so here are the published figures.

Oxfordshire County CouncilFee
Set-up plus first 7 days£180
Each further 7 days£70
Set-up on a bus route£220
Each further 7 days on a bus route£80
Tower scaffold or cherry picker, 2 daysfrom £230

Figures correct at October 2026. Councils review fees annually — we confirm the current rate when we quote.

Oxfordshire charges by the week, not the month, which is unusual — and it is why a long job here costs more in fees than the same job over the border. A scaffold up for three months is the set-up fee plus eleven extensions. We build the real duration into the quotation so you are not surprised by it halfway through.

Two things people do not expect. First, you cannot apply yourself — Oxfordshire only accepts applications from registered scaffolding companies, so the permission has to come through us. Second, if the frontage is on a bus route the fee goes up, so it is worth us knowing the road before we price it.

Allow five working days between applying and the scaffold going up. On a straightforward residential street that is usually the whole story. On a listed frontage, in a conservation area or on a main road it can be considerably longer, because the highway permission is only one of the consents involved.

Who is legally responsible for inspecting the scaffold

This one catches people out, and it is worth being straight about it.

Under the Work at Height Regulations 2005, a scaffold must be inspected by a competent person before it is first used, at intervals of no more than seven days thereafter, and again after anything that could have affected its stability — high winds, an impact, or any alteration. The inspection has to be recorded.

Here is the part most customers do not realise: once the scaffold has been handed over, the duty to arrange those seven-day inspections sits with the person using it, not with the scaffolding company. If you are a homeowner with a builder on site, in practice that is your builder. If you are the contractor, it is you.

We do the handover inspection, we tag the scaffold, and we will carry out the weekly inspections for you as part of the hire if you want us to — a lot of our domestic customers do, because nobody else on site is going to. But it needs agreeing rather than assuming. A scaffold tag on its own is a supplementary check; it is not the statutory inspection record.

What actually drives the price

Scaffolding quotations vary far more than people expect for what looks like the same job. These are the things that genuinely move the number, in roughly the order they matter.

  • Duration. The single biggest factor, and the one most often understated at quotation stage. A scaffold priced for four weeks and left up for fourteen becomes an expensive scaffold. We would rather quote the honest period at the start.
  • Access. Whether we can get a wagon near the building. Through-house carry on a terrace with no side gate can double the labour on an otherwise simple scaffold.
  • Height and lifts. Each lift adds material and time, and above a certain height the design changes rather than simply getting taller.
  • The ground. Soft, sloping, made-up or saturated ground needs stepped bases, spreaders or a designed foundation rather than a board and a base plate.
  • Whether it stands on the highway. A fee, lights, and sometimes traffic management or a pedestrian walkway.
  • What the building will take. Listed, historic or soft-mortar buildings may need a tied design replaced with a buttressed or independent one, which uses more material.
  • Loading. A scaffold for a window replacement is not a scaffold carrying pallets of stone slate. The intended load changes the specification.
  • Sheeting, netting and debris protection. Adds wind loading, which can change the tie pattern.

If a quotation is materially cheaper than the others, it is usually one of three things: a shorter hire period, a lighter duty class, or no highway permission included. Worth checking which.

Questions we get asked in Witney

How long does it take to get a scaffold up?
On a standard house, usually half a day to a day once we are on site. The lead time is the issue, not the erection — and if the scaffold stands on the highway, that permission sets the date.

Can I apply for the highway permission myself?
Generally no. Oxfordshire County Council takes applications from scaffolding companies, and in some authorities a member of the public cannot apply at all. We handle it.

How long can I keep the scaffold?
As long as you need, but the hire period in the quotation is what you are being charged for. Tell us the realistic programme and we will price that, rather than quoting four weeks and invoicing extensions.

Do you charge for a quotation or a site visit?
No. Both are free, and we would always rather come and look than price off a photograph.

Is the scaffold insured?
We carry public liability insurance and the scaffold remains our property throughout the hire. What is not covered is anyone climbing it who should not be — which is why it is tagged and why the ladder is removed or secured where appropriate.

What if the weather turns?
High winds are the common one. After any event likely to have affected stability the scaffold must be re-inspected before it is used again. If you are in any doubt, do not climb it — ring us.

Do you do temporary roofs?
Yes, spanning up to 40 metres, craned in or on a rolling track. On a re-roof that runs through winter it is usually cheaper than the delays it prevents.

Got a job in Witney?

Twenty minutes down the A4095. Tell us the address and we will come and look.

01869 254017 info@oxscaffold.co.uk