Scaffolding in Didcot

Didcot is about thirty-five minutes south of our yard at Enslow. It is the fastest growing town in Oxfordshire — a Garden Town with thousands of new homes going in and the old power station site being rebuilt from scratch. Almost everything here is new, and that changes the job.

Call 01869 254017 Request a site visit

New-build estates are harder than they look

On paper a Great Western Park extension should be simple. In practice the plots are narrow, the gardens back onto each other with no side access, the block paving will not take a loaded wagon, and the ground behind the house is often made up and still settling. Nine times out of ten the scaffold has to be carried through the house or craned over, and that needs knowing before the day rather than discovering on it. We come and look first.

Great Western Park & Valley Park

Thousands of homes, most under ten years old and already coming up for extensions, loft conversions and solar. Tight plots, shared drives, restricted access and warranty conditions that dictate how things are fixed.

Ladygrove

Nineties and two-thousands stock now hitting its first re-roofs, fascia and render repairs. Easier access than the newer estates, and usually a straightforward independent.

The power station site

The cooling towers are gone and the site is in long-term redevelopment. Industrial access on a site like that means inductions, permits, exclusion zones and a programme that is not yours to move.

Science Vale

Milton Park and Harwell Campus are minutes away. Commercial and laboratory work under permit, with controlled access and fixed programmes.

Who you need a licence from

Highway licences come from Oxfordshire County Council. Planning goes through South Oxfordshire District Council. On the newer estates there is a third party people forget: a good deal of the land is still managed by an estate management company rather than adopted by the council, so permission to stand on a verge or a shared drive may come from them. Worth checking before anyone turns up.

What we put up here

  • Domestic — extensions, loft conversions, re-roofs, solar, render and fascia work.
  • New-build support — access through the build, altered as the programme moves.
  • Commercial and industrial — permit-controlled sites across Science Vale.
  • Temporary roofs — weather protection spanning up to 40 metres, craned in or on a rolling track.

How we work

Free site visit and a written quotation stating the hire period. CISRS-qualified scaffolders working to TG20 and SG4. RAMS and a job-specific toolbox talk before work starts. Statutory inspections at least every seven days while the scaffold is in use. Advanced CHAS accredited, and Oxfordshire Prestige Awards Scaffold Company of the Year four years running.

We cover the rest of Oxfordshire, including Oxford and Bicester.

What putting a scaffold on the highway costs in Didcot

If any part of the scaffold stands on the footway, the verge or the carriageway, it needs permission from Oxfordshire County Council before it goes up. Most people have no idea what that costs until it appears on a quotation, so here are the published figures.

Oxfordshire County CouncilFee
Set-up plus first 7 days£180
Each further 7 days£70
Set-up on a bus route£220
Each further 7 days on a bus route£80
Tower scaffold or cherry picker, 2 daysfrom £230

Figures correct at October 2026. Councils review fees annually — we confirm the current rate when we quote.

Oxfordshire charges by the week, not the month, which is unusual — and it is why a long job here costs more in fees than the same job over the border. A scaffold up for three months is the set-up fee plus eleven extensions. We build the real duration into the quotation so you are not surprised by it halfway through.

Two things people do not expect. First, you cannot apply yourself — Oxfordshire only accepts applications from registered scaffolding companies, so the permission has to come through us. Second, if the frontage is on a bus route the fee goes up, so it is worth us knowing the road before we price it.

Allow five working days between applying and the scaffold going up. On a straightforward residential street that is usually the whole story. On a listed frontage, in a conservation area or on a main road it can be considerably longer, because the highway permission is only one of the consents involved.

Who is legally responsible for inspecting the scaffold

This one catches people out, and it is worth being straight about it.

Under the Work at Height Regulations 2005, a scaffold must be inspected by a competent person before it is first used, at intervals of no more than seven days thereafter, and again after anything that could have affected its stability — high winds, an impact, or any alteration. The inspection has to be recorded.

Here is the part most customers do not realise: once the scaffold has been handed over, the duty to arrange those seven-day inspections sits with the person using it, not with the scaffolding company. If you are a homeowner with a builder on site, in practice that is your builder. If you are the contractor, it is you.

We do the handover inspection, we tag the scaffold, and we will carry out the weekly inspections for you as part of the hire if you want us to — a lot of our domestic customers do, because nobody else on site is going to. But it needs agreeing rather than assuming. A scaffold tag on its own is a supplementary check; it is not the statutory inspection record.

What actually drives the price

Scaffolding quotations vary far more than people expect for what looks like the same job. These are the things that genuinely move the number, in roughly the order they matter.

  • Duration. The single biggest factor, and the one most often understated at quotation stage. A scaffold priced for four weeks and left up for fourteen becomes an expensive scaffold. We would rather quote the honest period at the start.
  • Access. Whether we can get a wagon near the building. Through-house carry on a terrace with no side gate can double the labour on an otherwise simple scaffold.
  • Height and lifts. Each lift adds material and time, and above a certain height the design changes rather than simply getting taller.
  • The ground. Soft, sloping, made-up or saturated ground needs stepped bases, spreaders or a designed foundation rather than a board and a base plate.
  • Whether it stands on the highway. A fee, lights, and sometimes traffic management or a pedestrian walkway.
  • What the building will take. Listed, historic or soft-mortar buildings may need a tied design replaced with a buttressed or independent one, which uses more material.
  • Loading. A scaffold for a window replacement is not a scaffold carrying pallets of stone slate. The intended load changes the specification.
  • Sheeting, netting and debris protection. Adds wind loading, which can change the tie pattern.

If a quotation is materially cheaper than the others, it is usually one of three things: a shorter hire period, a lighter duty class, or no highway permission included. Worth checking which.

Questions we get asked in Didcot

How long does it take to get a scaffold up?
On a standard house, usually half a day to a day once we are on site. The lead time is the issue, not the erection — and if the scaffold stands on the highway, that permission sets the date.

Can I apply for the highway permission myself?
Generally no. Oxfordshire County Council takes applications from scaffolding companies, and in some authorities a member of the public cannot apply at all. We handle it.

How long can I keep the scaffold?
As long as you need, but the hire period in the quotation is what you are being charged for. Tell us the realistic programme and we will price that, rather than quoting four weeks and invoicing extensions.

Do you charge for a quotation or a site visit?
No. Both are free, and we would always rather come and look than price off a photograph.

Is the scaffold insured?
We carry public liability insurance and the scaffold remains our property throughout the hire. What is not covered is anyone climbing it who should not be — which is why it is tagged and why the ladder is removed or secured where appropriate.

What if the weather turns?
High winds are the common one. After any event likely to have affected stability the scaffold must be re-inspected before it is used again. If you are in any doubt, do not climb it — ring us.

Do you do temporary roofs?
Yes, spanning up to 40 metres, craned in or on a rolling track. On a re-roof that runs through winter it is usually cheaper than the delays it prevents.

Got a job in Didcot?

Tell us the address and we will come and look before we quote.

01869 254017 info@oxscaffold.co.uk