Scaffolding in Bicester
Bicester is fifteen minutes from our yard at Enslow — straight up the A4095. It is the closest large town to us after Kidlington, which means short notice is usually not a problem and a site visit costs you nothing but a phone call.
Call 01869 254017 Request a site visitBicester is not a typical Oxfordshire town
Most Oxfordshire towns are old stock with some new estates bolted on. Bicester is the other way round — it has grown faster than almost anywhere in the county, and the scaffolding work reflects that.
Graven Hill
The UK’s largest self-build development. Plot owners are running their own builds, often to unusual designs, and they need access booked around their own programme rather than a main contractor’s. We are set up for that.
Kingsmere & Elmsbrook
Large modern estates where the work is extensions, loft conversions, solar and remedial cladding. Tight plots, shared driveways and soft or unfinished ground are the usual constraints — access, not the structure.
The old town
Around Sheep Street and Market Square the stock is older, tighter and often in a conservation area, with pavement frontages that mean a highway licence.
Retail & industrial
Bicester Village, the retail parks and the industrial estates off the A41 — commercial and industrial work where the building stays open and the public has to be protected underneath.
Highway licences in Bicester
If the scaffold stands on a public footpath or road, the licence comes from Oxfordshire County Council as highway authority, while Cherwell District Council handles the planning and conservation side. On Sheep Street and the older residential terraces this comes up regularly. The licence is usually what sets your start date, not the scaffold, so flag it early.
What we put up here
- Domestic — extensions, loft conversions, re-roofs, chimneys, rendering, repointing, windows and solar.
- Self-build support — access for the full build, altered as the programme moves.
- Commercial — retail and offices that stay open while we work.
- Temporary roofs — weather protection spanning up to 40 metres, craned in or on a rolling track.
How we work
Free site visit and written quotation. CISRS-qualified scaffolders working to TG20 and SG4. RAMS and a job-specific toolbox talk before work starts. Statutory inspections at least every seven days while the scaffold is in use. Advanced CHAS accredited, and Oxfordshire Prestige Awards Scaffold Company of the Year four years running.
We cover the rest of Oxfordshire too, and into Buckinghamshire and Bedfordshire.
What a scaffolding licence actually costs in Bicester
If any part of the scaffold stands on the footway, the verge or the carriageway, it needs a licence from Oxfordshire County Council before it goes up. Most people have no idea what that costs until it lands on a quotation, so here are the published figures.
| Oxfordshire County Council | Fee |
|---|---|
| Set-up plus first 7 days | £180 |
| Each further 7 days | £70 |
| Set-up on a bus route | £220 |
| Each further 7 days on a bus route | £80 |
| Tower scaffold or cherry picker, 2 days | from £230 |
Figures correct at October 2026. Councils review fees annually — we confirm the current rate when we quote.
Oxfordshire charges by the week, not the month, which is unusual — a scaffold up for three months is the set-up fee plus eleven extensions. We build the real duration into the quotation rather than surprising you halfway through. And you cannot apply yourself: Oxfordshire only accepts applications from registered scaffolding companies. If the frontage is on a bus route the fee goes up, so it is worth us knowing the road before we price it. Allow five working days minimum, and longer on a listed frontage or in the conservation area, where Cherwell District Council also has a say.
Who is legally responsible for inspecting the scaffold
Under the Work at Height Regulations 2005, a scaffold must be inspected by a competent person before first use, at intervals of no more than seven days thereafter, and again after anything that could have affected its stability — high winds, an impact, or any alteration. The inspection has to be recorded.
The part most customers do not realise: once the scaffold is handed over, the duty to arrange those seven-day inspections sits with the person using it, not with the scaffolding company. For a homeowner with a builder on site, in practice that is the builder. We do the handover inspection, we tag the scaffold, and we will carry out the weekly inspections as part of the hire if you want us to — but it needs agreeing rather than assuming. A tag is a supplementary check, not the statutory record.
What actually drives the price
Quotations vary far more than people expect for what looks like the same job. In roughly the order they matter:
- Duration. The biggest factor and the most often understated. A scaffold priced for four weeks and left up for fourteen becomes an expensive scaffold.
- Access. Whether a wagon can get near the building. Through-house carry on a terrace with no side gate can double the labour.
- Height and lifts. Above a certain height the design changes rather than simply getting taller.
- The ground. Soft, sloping, made-up or saturated ground needs stepped bases, spreaders or a designed foundation.
- Whether it stands on the highway. Licence fee, lights, sometimes traffic management or a pedestrian walkway.
- What the building will take. Listed or soft-mortar buildings may need a buttressed or independent design instead of a tied one.
- Loading. A window-replacement scaffold is not a scaffold carrying pallets of stone slate.
- Sheeting and netting. Adds wind loading, which can change the tie pattern.
If a quotation is materially cheaper than the others it is usually a shorter hire period, a lighter duty class, or no licence included. Worth checking which.
Questions we get asked in Bicester
Scaffolders in Bicester, and what hiring us actually involves
We are fifteen minutes up the A34 and the B4030, which matters more than it sounds. A Bicester job does not carry the travel loading that a firm coming out from Oxford or Milton Keynes has to build in, and if something needs adjusting mid-job we can be on site the same day rather than the following week.
Scaffolding hire in Bicester works the same way it does anywhere we operate: you are hiring the structure for a period, not buying it. The quote covers erection, the hire period, and the strike and removal at the end — we do not quote a cheap erection and then surprise you with a dismantling charge. If the job runs over, we extend the hire and tell you what it costs before it accrues.
- Free quotation and site visit. On most Bicester houses we can price from photographs and a description, and we will say so rather than insisting on a visit to look busy.
- Standard hire is measured in weeks. Most domestic jobs here run four to eight weeks. Longer is fine — but if the scaffold stands on the public footway, remember Oxfordshire County Council charges the licence weekly for the whole duration.
- Adjustments mid-hire. Lifts added, boards moved, a section taken out for a delivery. Ask us; never move it yourself. Altering a scaffold without the training is both dangerous and voids the handover.
- CISRS-qualified scaffolders, £10 million public liability, scafftags and recorded inspections for the whole hire.
Where in Bicester we work
The town splits into distinct jobs and the scaffold differs with each:
- Graven Hill. Self-build and custom-build plots, where we are often working to the client’s own build programme rather than a developer’s. Plot access and the sequence of trades matter more here than the elevations do.
- Kingsmere and the newer estates. Modern cavity-wall construction, predictable tying, repeated house types — which means once we have priced one we can price its neighbours accurately.
- Bure Park, Langford Village and Southwold. Established estates, mostly re-roofs, rendering, fascias and solar installs.
- The old town and the conservation area. Around Sheep Street, Market Square and Causeway, where stone, older brick and the footway all complicate the job, and a highway licence is usually part of it.
- Commercial and industrial. Bicester Village, the retail and distribution units off the A41, and the business parks — where the work is usually out of hours and the duty class is higher. See commercial scaffolding and industrial scaffolding.
How long does it take to get a scaffold up?
On a standard house, half a day to a day once we are on site. The lead time is the issue, not the erection — and if it stands on the highway, the licence sets the date.
Can I apply for the licence myself?
No. Oxfordshire County Council only accepts applications from registered scaffolding companies. We handle it.
How long can I keep the scaffold?
As long as you need, but the hire period in the quotation is what you are charged for. Tell us the realistic programme and we will price that.
Do you charge for a quotation or a site visit?
No. Both free, and we would rather come and look than price off a photograph.
Is the scaffold insured?
We carry public liability insurance and the scaffold stays our property throughout the hire.
What if the weather turns?
After any event likely to have affected stability the scaffold must be re-inspected before use. If in doubt, do not climb it — ring us.
Do you do temporary roofs?
Yes, spanning up to 40 metres, craned in or on a rolling track.
Got a job in Bicester?
We are fifteen minutes away. Tell us the address and we will come and look.
01869 254017 info@oxscaffold.co.uk