Scaffolding in Dunstable
Dunstable sits under the chalk escarpment of the Dunstable Downs, where two Roman roads cross. About fifty minutes from our yard at Enslow. It is a working town with a mix of medieval core, post-war estates and heavy industrial stock — and a crossroads that complicates almost every town centre job.
Call 01869 254017 Request a site visitThe A5 crossroads is the problem, not the building
Watling Street and the Icknield Way meet in the middle of Dunstable and both are still main roads. If your job fronts onto High Street North, High Street South, Church Street or West Street, the scaffold is going up beside moving traffic on a route that cannot simply be closed. That means a proper traffic management plan, often footway closure with a signed pedestrian diversion, and occasionally night or weekend working to get the erection done. None of it is difficult, but it has to be designed and agreed in advance — and it is the single most common reason a Dunstable job starts late.
The Priory & town centre
The Priory Church of St Peter is Norman and listed, and the streets around it are old, tight and conservation area. Frontages on the pavement, highway licence every time, and fixings into mortar joints rather than face stone.
Downside, Beecroft & Icknield
Post-war and later estates making up most of the housing. Re-roofs, chimneys, rendering, over-cladding and solar — often as planned programmes across several properties rather than one at a time.
Under the Downs
Properties on the chalk escarpment and the lanes running up it. Sloping sites that need stepped bases and raking, and chalk ground that behaves well dry and considerably less well after a wet fortnight.
Woodside & the industrial estates
Dunstable has a long industrial history and the estates are still busy. Industrial access on units that keep running, with vehicle movements dictating how we phase the work.
Who you need a licence from
Central Bedfordshire Council is a unitary authority, so the highway licence and the planning side come from the same body — one application, one contact. Worth knowing that the main routes through town carry their own traffic restrictions on top of the licence itself, so a High Street job needs more notice than a side street.
What we put up here
- Domestic — extensions, loft conversions, re-roofs, chimneys, rendering and solar.
- Main road frontages — with traffic management and pedestrian diversion designed in.
- Sloping sites — stepped bases on the escarpment, not guesswork.
- Commercial and industrial — occupied units across the Woodside estates.
- Temporary roofs — weather protection spanning up to 40 metres, craned in or on a rolling track.
How we work
Free site visit and a written quotation stating the hire period. CISRS-qualified scaffolders working to TG20 and SG4. RAMS and a job-specific toolbox talk before work starts. Statutory inspections at least every seven days while the scaffold is in use. Advanced CHAS accredited, and Oxfordshire Prestige Awards Scaffold Company of the Year four years running.
We cover the rest of Bedfordshire — including Leighton Buzzard just up the road — and across into Buckinghamshire.
What a scaffolding licence actually costs in Dunstable
If any part of the scaffold stands on the footway, the verge or the carriageway, it needs a licence from Central Bedfordshire Council before it goes up. Most people have no idea what that costs until it appears on a quotation, so here are the published figures.
| Central Bedfordshire Council | Fee |
|---|---|
| First month | £190.10 |
| Each additional month | £163.00 |
Figures correct at October 2026. Councils review fees annually — we confirm the current rate when we quote.
Central Bedfordshire bills by the month, with a reduced rate for each month after the first. That suits longer jobs — a re-roof running into a second month costs less in fees here than the equivalent in Oxfordshire, where the clock runs weekly. Applications go through the council streetworks team, and because Central Bedfordshire is unitary the same body deals with planning matters alongside the highway side.
Allow around two weeks between applying and the scaffold going up.
Who is legally responsible for inspecting the scaffold
This one catches people out, and it is worth being straight about it.
Under the Work at Height Regulations 2005, a scaffold must be inspected by a competent person before it is first used, at intervals of no more than seven days thereafter, and again after anything that could have affected its stability — high winds, an impact, or any alteration. The inspection has to be recorded.
Here is the part most customers do not realise: once the scaffold has been handed over, the duty to arrange those seven-day inspections sits with the person using it, not with the scaffolding company. If you are a homeowner with a builder on site, in practice that is your builder. If you are the contractor, it is you.
We do the handover inspection, we tag the scaffold, and we will carry out the weekly inspections for you as part of the hire if you want us to — a lot of our domestic customers do, because nobody else on site is going to. But it needs agreeing rather than assuming. A scaffold tag on its own is a supplementary check; it is not the statutory inspection record.
What actually drives the price
Scaffolding quotations vary far more than people expect for what looks like the same job. These are the things that genuinely move the number, in roughly the order they matter.
- Duration. The single biggest factor, and the one most often understated at quotation stage. A scaffold priced for four weeks and left up for fourteen becomes an expensive scaffold. We would rather quote the honest period at the start.
- Access. Whether we can get a wagon near the building. Through-house carry on a terrace with no side gate can double the labour on an otherwise simple scaffold.
- Height and lifts. Each lift adds material and time, and above a certain height the design changes rather than simply getting taller.
- The ground. Soft, sloping, made-up or saturated ground needs stepped bases, spreaders or a designed foundation rather than a board and a base plate.
- Whether it stands on the highway. A licence fee, lights, and sometimes traffic management or a pedestrian walkway.
- What the building will take. Listed, historic or soft-mortar buildings may need a tied design replaced with a buttressed or independent one, which uses more material.
- Loading. A scaffold for a window replacement is not a scaffold carrying pallets of stone slate. The intended load changes the specification.
- Sheeting, netting and debris protection. Adds wind loading, which can change the tie pattern.
If a quotation is materially cheaper than the others, it is usually one of three things: a shorter hire period, a lighter duty class, or no licence included. Worth checking which.
Questions we get asked in Dunstable
How long does it take to get a scaffold up?
On a standard house, usually half a day to a day once we are on site. The lead time is the issue, not the erection — and if the scaffold stands on the highway, the licence sets the date.
Can I apply for the licence myself?
Generally no. Central Bedfordshire Council takes applications from scaffolding companies, and in some authorities a member of the public cannot apply at all. We handle it.
How long can I keep the scaffold?
As long as you need, but the hire period in the quotation is what you are being charged for. Tell us the realistic programme and we will price that, rather than quoting four weeks and invoicing extensions.
Do you charge for a quotation or a site visit?
No. Both are free, and we would always rather come and look than price off a photograph.
Is the scaffold insured?
We carry public liability insurance and the scaffold remains our property throughout the hire. What is not covered is anyone climbing it who should not be — which is why it is tagged and why the ladder is removed or secured where appropriate.
What if the weather turns?
High winds are the common one. After any event likely to have affected stability the scaffold must be re-inspected before it is used again. If you are in any doubt, do not climb it — ring us.
Do you do temporary roofs?
Yes, spanning up to 40 metres, craned in or on a rolling track. On a re-roof that runs through winter it is usually cheaper than the delays it prevents.
Got a job in Dunstable?
If it fronts the A5, tell us early. Everything else we can usually turn round quickly.
01869 254017 info@oxscaffold.co.uk