Scaffolding in Northampton
Northampton is a little under half an hour from our yard at Enslow, up the A43. It is the biggest town we cover and one of the few places where you deal with a single council for everything — which, if you have ever run a job in Oxfordshire, you will appreciate.
Call 01869 254017 Request a site visitOne council, not two
Across the border in Oxfordshire a pavement job means the county council for the highway licence and the district council for planning — two bodies, two timescales, and a start date that depends on both. West Northamptonshire Council is a unitary authority, so it is the highway authority and the planning authority. One application, one point of contact, and in our experience a quicker answer. It is a small thing until you are waiting on it.
The old shoe factories
Northampton made boots and shoes for two centuries and the Victorian factory buildings are still standing, most of them now flats or offices. Tall, solid brick, awkward rear elevations and usually occupied — the access has to be designed around people living inside.
Town centre & Market Square
One of the largest market squares in England, ringed by listed and locally listed frontages sitting straight onto the pavement. Highway licence, pedestrian route kept open, and fixings into joints rather than face brick.
Abington, Kingsthorpe & Far Cotton
Victorian and inter-war terraces making up much of the town. Re-roofs, chimneys, repointing and rendering — and on the terraces, scaffold that has to be got through the house because there is no side access at all.
Brackmills & the distribution parks
Northampton is a national logistics hub. Industrial access on warehousing and distribution units that run around the clock, so the work happens around them rather than the other way round.
The Nene is closer than you think
The River Nene runs through the south of the town and the flood plain reaches further than people expect — Far Cotton, St James and the Waterside area all sit low. Ground that carries a loaded standard in summer will not in winter. We sole-board properly and spread the load rather than assuming, and on riverside work we will say so at quotation stage rather than finding out on site.
What we put up here
- Domestic — extensions, loft conversions, re-roofs, chimneys, repointing, rendering and solar.
- Terraced access — where there is no side gate and everything comes through the house.
- Conversions — long-duration access on former factory and industrial buildings.
- Commercial and industrial — units that stay in operation while we work.
- Temporary roofs — weather protection spanning up to 40 metres, craned in or on a rolling track.
How we work
Free site visit and a written quotation stating the hire period. CISRS-qualified scaffolders working to TG20 and SG4. RAMS and a job-specific toolbox talk before work starts. Statutory inspections at least every seven days while the scaffold is in use. Advanced CHAS accredited, and Oxfordshire Prestige Awards Scaffold Company of the Year four years running.
We cover Oxfordshire, Buckinghamshire and Bedfordshire too — including Banbury and Milton Keynes, both a short run from Northampton.
What a scaffolding licence actually costs in Northampton
If any part of the scaffold stands on the footway, the verge or the carriageway, it needs a licence from West Northamptonshire Council before it goes up. Most people have no idea what that costs until it appears on a quotation, so here are the published figures.
| West Northamptonshire Council | Fee |
|---|---|
| Up to 5m of scaffold | £85 per month |
| 6m to 10m | £140 per month |
| 11m to 20m | £170 per month |
| Each additional 20m | £50 per month |
Figures correct at October 2026. Councils review fees annually — we confirm the current rate when we quote.
West Northamptonshire is the only authority in our patch that prices the licence by the length of the scaffold rather than a flat fee. A single-fronted terrace sits in the cheapest band; a long elevation or a wrap-around runs up through the bands quickly. It means the licence cost moves with the design, so it is worth talking about the scope before the scaffold is drawn.
As in Oxfordshire, a member of the public cannot apply directly — the council takes applications from scaffolding companies only, so it comes through us. The council also requires lights, and in some cases cones, to be supplied and maintained by us for the duration of the hire.
Allow around two weeks between applying and the scaffold going up. On a straightforward residential street that is usually the whole story; on a main road or a listed frontage it can take considerably longer.
Who is legally responsible for inspecting the scaffold
This one catches people out, and it is worth being straight about it.
Under the Work at Height Regulations 2005, a scaffold must be inspected by a competent person before it is first used, at intervals of no more than seven days thereafter, and again after anything that could have affected its stability — high winds, an impact, or any alteration. The inspection has to be recorded.
Here is the part most customers do not realise: once the scaffold has been handed over, the duty to arrange those seven-day inspections sits with the person using it, not with the scaffolding company. If you are a homeowner with a builder on site, in practice that is your builder. If you are the contractor, it is you.
We do the handover inspection, we tag the scaffold, and we will carry out the weekly inspections for you as part of the hire if you want us to — a lot of our domestic customers do, because nobody else on site is going to. But it needs agreeing rather than assuming. A scaffold tag on its own is a supplementary check; it is not the statutory inspection record.
What actually drives the price
Scaffolding quotations vary far more than people expect for what looks like the same job. These are the things that genuinely move the number, in roughly the order they matter.
- Duration. The single biggest factor, and the one most often understated at quotation stage. A scaffold priced for four weeks and left up for fourteen becomes an expensive scaffold. We would rather quote the honest period at the start.
- Access. Whether we can get a wagon near the building. Through-house carry on a terrace with no side gate can double the labour on an otherwise simple scaffold.
- Height and lifts. Each lift adds material and time, and above a certain height the design changes rather than simply getting taller.
- The ground. Soft, sloping, made-up or saturated ground needs stepped bases, spreaders or a designed foundation rather than a board and a base plate.
- Whether it stands on the highway. A licence fee, lights, and sometimes traffic management or a pedestrian walkway.
- What the building will take. Listed, historic or soft-mortar buildings may need a tied design replaced with a buttressed or independent one, which uses more material.
- Loading. A scaffold for a window replacement is not a scaffold carrying pallets of stone slate. The intended load changes the specification.
- Sheeting, netting and debris protection. Adds wind loading, which can change the tie pattern.
If a quotation is materially cheaper than the others, it is usually one of three things: a shorter hire period, a lighter duty class, or no licence included. Worth checking which.
Questions we get asked in Northampton
How long does it take to get a scaffold up?
On a standard house, usually half a day to a day once we are on site. The lead time is the issue, not the erection — and if the scaffold stands on the highway, the licence sets the date.
Can I apply for the licence myself?
Generally no. West Northamptonshire Council takes applications from scaffolding companies, and in some authorities a member of the public cannot apply at all. We handle it.
How long can I keep the scaffold?
As long as you need, but the hire period in the quotation is what you are being charged for. Tell us the realistic programme and we will price that, rather than quoting four weeks and invoicing extensions.
Do you charge for a quotation or a site visit?
No. Both are free, and we would always rather come and look than price off a photograph.
Is the scaffold insured?
We carry public liability insurance and the scaffold remains our property throughout the hire. What is not covered is anyone climbing it who should not be — which is why it is tagged and why the ladder is removed or secured where appropriate.
What if the weather turns?
High winds are the common one. After any event likely to have affected stability the scaffold must be re-inspected before it is used again. If you are in any doubt, do not climb it — ring us.
Do you do temporary roofs?
Yes, spanning up to 40 metres, craned in or on a rolling track. On a re-roof that runs through winter it is usually cheaper than the delays it prevents.
Got a job in Northampton?
Half an hour up the A43. Tell us the address and we will come and look.
01869 254017 info@oxscaffold.co.uk