Temporary Roof Scaffolding Hire in Oxfordshire

Temporary roofs are what we are best known for. We design, supply and install weather protection spanning up to 40 metres from our yard at Enslow, near Kidlington, across Oxford and Oxfordshire and into Buckinghamshire and Bedfordshire. Craned in or rolled out on a track, depending on what the site allows, and designed for the stone, slate and listed roofs this part of the country is full of.

Call 01869 254017 Discuss a temporary roof

When you actually need one

A temporary roof is not scaffolding with a sheet over it. It is an independent structure that takes the weather off the building so work can carry on underneath, and it earns its cost in four situations:

  • The roof is coming off. A full strip and re-cover leaves the building open. A temporary roof means the job does not have to be weather-dependent.
  • The building cannot get wet. Historic fabric, thatch, exposed timber frame, a property still occupied, or a commercial interior that has to stay in use.
  • The programme cannot slip. If rain stops the job, the trades still get paid and the programme still moves. Weather protection is usually cheaper than the delay.
  • The work is seasonal. Anything running through autumn and winter in this part of the country will lose days without cover.

Why Oxfordshire needs them more than most counties

On a modern estate, a re-roof that gets rained on is an inconvenience. Tiles go back, the felt gets replaced, you carry on.

Much of Oxfordshire is not that. Cotswold stone roofs, lime mortar, oak structures and lath and plaster ceilings beneath. Strip one of those and the building is genuinely exposed:

  • Stone roofs are heavy and the structure beneath them is old. Oak purlins and rafters that have been dry for three hundred years do not take a fortnight of rain well, and the damage is not always visible until later.
  • Lime work needs dry conditions to cure. Repointing or rebedding in lime during a wet autumn either does not go off properly or gets washed out. A temporary roof is often the only way to keep a lime programme on schedule between October and March.
  • Lath and plaster ceilings are the first casualty. Water through an open roof finds them before it finds anything else, and replacing a historic ceiling costs considerably more than the roof ever would.
  • On a listed building, water damage is damage to protected fabric. That is a different conversation with a conservation officer than a wet carpet.

So in Chipping Norton, Woodstock, Burford, Wallingford and the villages between them, a temporary roof is frequently not an upgrade. It is the only responsible way to do the job between autumn and spring.

Stone and slate re-roofs

Cotswold stone and natural slate, where the covering is heavy and the structure underneath is old. The most common reason we are called.

Listed buildings and conservation areas

Where water ingress is damage to protected fabric and the work often runs long because it is done by hand.

Winter lime programmes

Repointing and rebedding that simply cannot be done in the open between October and March.

Occupied buildings

Schools, churches, pubs and houses that have to stay in use while the roof is off. The roof keeps the building working, not just dry.

How we build them, and which type you need

There are two practical ways to get a roof over a building, and the right one depends on access more than on the building.

Craned in

Sections are assembled at ground level and lifted into place. Fast, and the right answer where there is room for a crane and somewhere to build. It needs clear access and a lift plan, and near an aerodrome it needs checking first.

Rolling track

The roof is built at one end and rolled along a track as the work progresses. No crane, works on tight sites, and lets the roofers expose one section at a time, which on an old structure is often the safer approach anyway.

Sheeting options

Keder for a tensioned, weathertight finish. Corrugated iron or aluminium cladding where durability matters. Shrink wrap for irregular shapes and tight encapsulation. The choice changes the wind loading as much as the weather resistance.

Spans to 40m

Clear spans up to forty metres, so the working area underneath stays unobstructed. Larger structures are designed rather than assembled to a standard configuration.

On a long roof the rolling arrangement means you only ever cover the section being worked on, which keeps the structure, and the cost, proportionate.

The engineering: wind is the problem, not rain

People assume a temporary roof is designed to keep water out. It is, but that is the easy part. The thing that governs the design is wind.

The moment you sheet a structure you turn it into a sail. A sheeted roof is a large, more or less solid surface, and the uplift and lateral load it catches are considerably larger than the weight of the roof itself. Those loads have to go somewhere: into the ties, into the building and into the ground. The consequences run right down the scaffold:

  • More ties, and heavier ones, because the whole structure is now resisting wind on a sail rather than just supporting a platform.
  • Base loadings increase, so the ground and the base design matter more. Soft or made-up ground that would carry an open scaffold may need spreaders or a designed foundation.
  • Sheeting specification matters. Shrink wrap, reinforced sheeting and open mesh behave very differently in wind, and the choice changes the loads.
  • Ballast or kentledge where ties into the building are not possible.

That is why a temporary roof almost always falls outside TG20:21 and needs a bespoke scaffold design from an engineer, with calculations for the actual span, sheeting type and exposure. It also means the building has to be capable of taking the load. On a stone or timber-framed building that will not accept conventional ties, the design frequently takes the load to the ground on independent towers rather than into the walls. That costs more. It is also the difference between a temporary roof and a liability.

It is why we will not simply add a roof to an existing scaffold without checking the structure underneath can take it. And if a quotation for a temporary roof does not mention a design, ask who has done the calculations.

Why a temporary roof pays for itself

A temporary roof is the most expensive thing on a scaffolding quotation and the easiest to talk yourself out of. The argument for it is not comfort, it is programme.

Strip a roof in October without cover and you are working to the weather forecast. Every wet day is a lost day, and on an open structure a wet day is not neutral. Water gets into ceilings, plaster, insulation and joinery that were dry when you started. The cost of a temporary roof is fixed and known at the outset. The cost of six weeks of rain delays, plus making good damage to the inside of a building, is neither.

What a temporary roof is right for

  • Re-roofs running through winter, particularly stone slate and clay tile, where the strip is slow and the deck is open for weeks.
  • Listed and historic buildings, where exposing old timber and plaster to weather causes damage that cannot be undone.
  • Fire and flood reinstatement, where the building is already open and needs protecting while it dries and is rebuilt.
  • Timber frame, which must not get wet before it is closed in.
  • Occupied buildings such as schools, care homes and flats, where the inside has to stay usable throughout.

Approvals for a temporary roof

  • Highway licence. If any part of the scaffold or roof stands on a public footway or road, it needs a licence from the highway authority under section 169 of the Highways Act 1980. In Oxfordshire that is Oxfordshire County Council. In Buckinghamshire it is Buckinghamshire Council, except Milton Keynes, Bletchley and Newport Pagnell, which come under Milton Keynes City Council. In Bedfordshire it is Central Bedfordshire, Bedford Borough or Luton Borough Council depending on the town.
  • Planning, conservation and listed building matters sit with your district council. In Oxfordshire that is West Oxfordshire, Cherwell, South Oxfordshire, the Vale of White Horse or Oxford City, depending on where you are.

The licence matters more on a temporary roof than on an ordinary scaffold, because a roof job runs for weeks or months rather than days and the council charges for the whole time the structure stands on the highway. It is a recurring cost across the programme, not a one-off fee. Oxfordshire does not accept applications from the public, so we apply. We need lead time, and the licence usually sets the start date rather than our diary. Any licence fee we quote is indicative, taken from the council's published schedule, so treat it as a budget figure until the application goes in.

The temporary roof itself does not normally need consent. The work beneath it very often does, and on a listed building the method of fixing and the duration can both be conservation matters. Settle that before the roof goes up.

How we price a temporary roof

There is no honest per-square-metre rate for a temporary roof, and anyone quoting you one has not looked at the building. The span and the wind exposure move the cost more than the floor area does. A roof spanning 8 metres and one spanning 25 metres are different structures, not the same structure at two sizes. What we are actually pricing:

  • Clear span. The single biggest factor. Beam depth, bracing and the supporting scaffold all step up together as the span grows.
  • The engineer's design. A sheeted roof falls outside TG20:21, so there is a bespoke design and calculation package in every price. Modest on a simple house, significant on a complex or listed building.
  • Craned or rolling. Craning is quicker but brings crane hire, a lift plan and the access to use them. A rolling roof removes the crane and adds erection time and track.
  • Where the load goes. If the building takes ties, the supporting scaffold is conventional. If it will not, which is common on stone, timber frame and listed fabric, the load goes to the ground on independent towers, and that is a materially bigger scaffold.
  • Exposure. An exposed ridge on the Downs is a different wind calculation from a sheltered terrace in central Oxford, for the same building.
  • Duration. Temporary roofs are hired by the week for the whole programme. A six-week job and a six-month job are nowhere near each other.
  • Highway licence. If any part stands on the footway, the council charges for the full duration. On a long heritage programme that is a real line, not a rounding error.
  • Inspections. A recorded inspection at least every seven days and after any event that could have affected the structure, for the length of the hire. That is in our price, not an extra.

In practice a temporary roof is typically the largest single line on a scaffolding quotation, and on a short summer job it is often not worth it. On anything running through autumn or winter, or over a roof you cannot afford to get wet, it is usually cheaper than the alternative.

Tell us the roof's plan size, the ridge height, whether the building is listed, how long the roofers need and whether a crane can get in. That is enough for a firm figure without a visit on most domestic work. Anything larger, we come and look.

What you get from us

  • A bespoke design with calculations, and the drawing to go with it, not a verbal assurance that it will be fine.
  • Erection by CISRS-qualified scaffolders working to TG20:21 and SG4, with the supporting scaffold to BS EN 12811-1 in the correct duty class for what is actually being loaded onto it. Stone and slate are heavy, and a roof being stripped means loaded platforms.
  • RAMS and a job-specific toolbox talk issued before work starts.
  • Scafftags and recorded seven-day inspections for the whole hire.
  • Handover paperwork: design, inspection record and the highway licence where one applies. On a listed building your conservation officer or architect may well ask for it.
  • The highway licence applied for by us, with honest lead times.
  • £10 million public liability insurance.

Who is responsible for inspecting it

Under the Work at Height Regulations 2005 the scaffold must be inspected by a competent person before first use, at intervals of no more than seven days, and again after any event likely to have affected its stability. On a temporary roof that last clause is the one that matters. A roof presents a much larger surface to the wind than an open scaffold, so after a gale the roof and its ties must be checked before anyone works under or on it again.

After handover the duty sits with the person using the scaffold, not with us. On a temporary roof we strongly encourage you to instruct us to carry out the weekly inspections under the hire, because the sheeting and tie checks are not something a general site team will spot problems with. Agree it rather than assume it. More on how that works on our scaffold inspection page.

Where we install them

From the yard at Enslow we cover the whole of Oxfordshire, and the heritage work clusters in the west and south:

Beyond the county we install them in Buckinghamshire, including Aylesbury, Buckingham and Milton Keynes, and in Bedfordshire, including Leighton Buzzard, Biggleswade, Bedford and Luton. Temporary roofs are the work most worth travelling for, so if you are near the edge of that, still ring us. For everything else we do locally, see scaffolding in Oxfordshire.

Questions we get asked about temporary roofs

How much does a temporary roof cost?

It is driven by clear span, how long you need it and whether the load goes into the building or to the ground, not by floor area, which is why a per-square-metre rate is meaningless. Send us the roof's plan size, the ridge height, the duration and whether the building is listed, and we will give you a firm figure. For most houses we can price it without a visit.

Do I need a temporary roof for a re-roof, or will sheeting do?

If you are stripping a modern tiled roof in summer and can close it up quickly, sheeting over the scaffold is often enough. If you are stripping Cotswold stone or slate, working through autumn or winter, exposing old timber or lath and plaster, or the roof will be open for more than a few days, a temporary roof is the sensible answer. Sheeting flaps, lifts and leaks; a roof does not.

How big a span can you do?

Up to 40 metres clear, craned in or on a rolling track. That covers almost anything domestic and most commercial work.

How long does it take to put up?

A craned roof on a straightforward house is usually a day or two once the supporting scaffold is up. A rolling roof takes longer. The real constraint is rarely erection time. It is the engineer's design and, if the highway is involved, the council licence. Allow a couple of weeks from go-ahead.

Can we work underneath in any weather?

In normal weather, yes. That is the point. In high winds work stops, and after a gale the structure is inspected before anyone goes back under it.

Will it stand up to a winter storm?

That is exactly what the design is for. A sheeted roof catches far more wind than an open scaffold, so it is designed outside TG20:21 with calculations for the actual span, sheeting and exposure. We also inspect it at least every seven days and after any event that could have affected it, as the Work at Height Regulations 2005 require.

Is it cheaper than taking the chance?

On a job of any length through autumn or winter, almost always. The roof is a known cost; weather delay and water damage are not.

Can it go on a scaffold that is already up?

Only if the structure underneath was designed for it. Adding a roof changes the wind loading completely, so we check before we agree.

Can you fit one where the building will not take scaffold ties?

Yes. On stone, timber-framed and listed buildings we design the load to the ground on independent towers rather than tying into the fabric. It is a larger scaffold and it costs more, but it is the right answer where tie holes in protected stonework are not acceptable.

Does a temporary roof need planning permission?

Not normally, as it is a temporary structure. The work underneath frequently does, and on a listed building the fixing method and how long the building stays covered can both be matters for your conservation officer. If any part stands on the public footway or road you need a highway licence from the council, which we apply for.

Can we stay in the building while the roof is off?

In most cases, yes. That is one of the main reasons people choose one. We install them over occupied houses, schools, churches and pubs. Tell us at the quoting stage, because it changes where we can put legs, how we sequence the erection and the pedestrian protection.

Do you sheet it or net it?

It depends on the job. Solid sheeting keeps weather out but carries the most wind load; mesh is lighter but lets water through. We will tell you which is right rather than defaulting.

Need a building kept dry?

If you have a roof plan, a photograph of the building and a rough duration, we can usually give you a figure the same day.

01869 254017 info@oxscaffold.co.uk
CONTACT US

Do You Have A Question?

Please feel free to contact us anytime to discuss your requirements.

GET IN TOUCH !!!

Please feel free to contact us anytime to discuss your requirements. Or use the form below and we will get back to you as soon as possible.